Help By job

How to use it, by job

Work is a cycle: research, learn, turn it into a plan, then do it. LB TAB Layers gives that cycle a helping hand. Start with the job closest to yours.

A screen with 36 tabs open, many of them schedules and cut lists with similar names
Does your screen look like this?Dozens of tabs, with schedules and cut lists that all look alike. You can’t tell which one belongs to which job.
Putting open tabs away into a group for a project
Put them together, job by job.Just name a group and put the tabs away. Next time, open only the pages for that job.
1Research

Put the pages you find into a project’s group. When you need them, search from one box.

2Learn

Leave what you thought while reading in that page’s note.

3Plan

Turn what you have gathered into steps and documents.

4Do

Open a project’s pages together, check, hand over, and close them when you are done.

Directors & editors

People who review video and ask for changes.

A common problemReferences and feedback end up scattered across projects.

Directors & editors: the whole flow
Open the project and copy the location of the footage folder. Pause the video on your computer and write right there. The notes you write come together on a timecoded sheet (about 60 seconds).
  1. Open today’s project with a single ▶.Open all tabs ▶
  2. Keep the footage folder’s location in the same group. Click it to copy the path.PC folders
  3. Open the video straight from the file on your computer. It is never uploaded.Video files on your computer
  4. Pause and write right there. Press Enter and playback continues.Pause a video and write
  5. Step frame by frame and keep writing.Keep writing (Revision mode)
  6. Your notes come together on a timecoded sheet.Revision sheet
  7. Hand them over as a PDF or PowerPoint.PDF & PowerPoint

Production (producers & coordinators)

People who run several projects at once.

A common problemSchedules, feedback and due dates are scattered across projects. You lose track of which sheet is the latest.

Production (producers & coordinators): the whole flow
Three projects, eleven schedules and cut lists. Put away the projects you are not working on, leave a note on today’s schedule, work through the steps, then move to the next project. One continuous flow (about 100 seconds).
  1. Put away the projects you are not working on with ■. Only today’s schedule and cut list remain.Close all tabs ■
  2. Click a row inside the group to open the schedule.Working with saved tabs
  3. Keep the project folder (its location on your PC or NAS) in the same group. Pages and folders, together in one project.PC folders
  4. Leave what you notice in that schedule’s note. It is at the top the next time you open it.Notes for this page
  5. Create today’s steps from a template and attach them to the project.Link to a project
  6. Check them off one by one.Work through the steps
  7. When you are done, close everything together with ■. The bookmarks stay.Close all tabs ■
  8. Open the next project’s pages together with a single ▶.Open all tabs ▶

Animators & 3D modelers

People who create while looking at references, and fix things when feedback comes back.

A common problemDozens of reference pages, schedules and cut lists stay open.

Animators & 3D modelers: the whole flow
From tabs where references and lists are mixed together, put away the lists you don’t need right now. Open a reference, filter its images by size, and leave a note. Check the feedback you received, and close everything when you are done (about 100 seconds).
  1. Put away the lists you don’t need right now with ■.Close all tabs ■
  2. Keep reference pages sorted by project, and click a row to open one.Working with saved tabs
  3. Keep the working files’ folder in the project’s group. Click it to copy the path.PC folders
  4. List a page’s images and filter them by size.List the images on a page
  5. Leave what you notice in that page’s note.Notes for this page
  6. Check the feedback you received on a timecoded sheet, moment by moment.Revision sheet
  7. When you are done, close everything together with ■.Close all tabs ■

Designers & web production

People with lots of reference sites and screenshots.

A common problemThe references you wanted to look at later can’t be found.

Designers & web production: the whole flow
Open the reference sites together, and capture the pages that catch your eye one after another. When they build up, look across them on a big screen (about 50 seconds).
  1. Open a project’s reference sites together with a single ▶.Open all tabs ▶
  2. Keep the assets folder in the same group.PC folders
  3. Capture a page that catches your eye with one button.Capture this page
  4. After a few captures, save them together as a PowerPoint and hand it over.Save all
  5. Write notes with numbers on a capture.Mark up a screenshot
  6. When they build up, look across them on a big screen.Open the Dashboard

Planners

People who gather material from all over and build a plan.

A common problemYou lose track of where the examples and numbers you collected are.

Planners: the whole flow
Put an example you found into the plan’s group on the spot. Leave your thoughts in a note and capture the page. Later, find it all from one box (about 50 seconds).
  1. Put an example into the plan’s group the moment you find it.Add current tab
  2. Leave your thoughts in that page’s note.Notes for this page
  3. Select a sentence on the page and add it to the note.Add selected text to Notes
  4. Capture pages as the starting point for a PowerPoint.Save all
  5. When you need them, search from one box. Bookmarks and notes alike.Search

Sales planning

People who manage clients and materials deal by deal.

A common problemEvery proposal means hunting for the same pages and opening them again.

Sales planning: the whole flow
Open a client’s pages and copy the location of the materials folder. Create the steps up to submission and work through them, close everything when you are done, and move on to the next client. One continuous flow (about 60 seconds).
  1. Open today’s client with a single ▶.Open all tabs ▶
  2. Keep the materials folder’s location in the same group. Click it to copy the path.PC folders
  3. Click a row inside the group to bring up the proposal.Working with saved tabs
  4. Create the steps up to submission from a template and attach them to the client.Link to a project
  5. Check them off one by one.Work through the steps
  6. When you are done, close everything together with ■. The bookmarks stay.Close all tabs ■
  7. The next client, too, with a single ▶.Open all tabs ▶

Office work & accounting

People who want to get through each day’s procedures without missing a step.

A common problemMissed steps, and opening the same pages again and again.

Office work & accounting: the whole flow
Create the steps for the month-end close from a template. Open the pages you need together and leave what you notice in a note. Check off the steps one by one, and close everything when you are done (about 75 seconds).
  1. Create the steps from a template and attach them to the job’s group.Link to a project
  2. Open the pages you need together with a single ▶.Open all tabs ▶
  3. Click a row inside the group to bring up a page.Working with saved tabs
  4. Leave what you notice in that page’s note.Notes for this page
  5. Check them off one by one. When all are done, the task is complete.Work through the steps
  6. When you are done, close everything together with ■.Close all tabs ■
  7. See today’s count next to your goal.Goals & rewards
Don’t have it yet?

LB TAB Layers is free to add to Chrome. Once it is installed, press Alt+T to open it any time.

Add to Chrome for free